FAQ: How long does it take to build a Deltec?

October 24, 2016

Timing is important! That’s why one of the first things people ask, and one of the first things we try to explain, is how long it typically takes to build a Deltec, from breaking ground to moving in.

Answer:

First, I’d like to guide you to our general building timeline. This shows three typical scenarios. The time frame from deposit to move-in day can vary greatly depending on your situation, but 12 – 18 months is most common. If you decide to go with a model from the Renew Collection or PreDesigned Collection, that time can be greatly reduced since those floorplans are pre-configured for you.

We like to emphasize the benefits of getting started on your project sooner rather than later, even if you aren’t building in the near future or don’t have property yet, so that you have plenty of time to select options and work on the floorplan.